Bank of Baroda Roof Top Signage Refurbishment

July 2018

Brief given by client?

Client shown 2 signage on the roof to be refurbished

How the problem affected their goals?

Yes. The Bad sign affecting their credibility and visibility in the market

How many competitors?

3 competitors, Adventrix won over competition due to its ability to handle complex roof top installations

Mode of Procurement: RFP?

Yes through Ad agency handling the Brand Awareness

Describe the best solution provided by Adventrix in detail.

Adventrix Analyzed  the whole situation and offered the best solution. The Building is 15 floors tall and roads are just adjacent to the building. There is no way that we can use any access equipment such as crane or boom lift to access the location. Also the height is too high for such work. Hence, Adeventrix proposed roof top hanging scaffolding build from roof and hung outside the building to access the sign location. Adventrix successfully refurbished the signage and handed over.

The challenges that arose during the implementation and how Adventrix tackled it.

The different permissions and safety measures to be taken while doing such a complex job was quite challenging.

How long did it take for the successful installation?

4 months

Internal Shop Floor Drawings.

It was not a difficult task.

Approval Process:

Approval came instantly

Production & Delivery USP?

Making the product to the guidelines and agreeable to the client is one  of the main USP of Adventrix.

Installation USP?

Analyzing site and offering site specific access solution is one of the key USP of Adventrix.

Client Inspection & Feedback

The client expression was WOW, The building was already a Landmark in Dubai, on top of that the Signage is decorating it and sits as a crown for the building

DUBAI INVESTMENTS DATE

June 2018

Brief given by client?

Client wanted to replace the old sign with new rebranded sign on Glass facade of the building

How the problem affected their goals?

Client has re-branded the logo needs to replace the old with new.

How many competitors?

3 competitors, Adventrix won over competition due to its ability to handle complex roof top installations.

Mode of Procurement: RFP?

Yes through Ad agency handling the Brand Awareness.

Describe the best solution provided by Adventrix in detail.

Adventrix analyzed the whole situation and offered the best solution. The Building is cladded with full glazed panels. There was an existing sign which was fixed on to the brackets which were prefixed when building was constructed. Adventrix positioned the signs in such a way that the existing brackets will be used as far as possible and new brackets will be installed as required.

The challenges that arose during the implementation and how Adventrix tackled it.

The building cradle was used for installation, the signs have been made in pieces as it can be taken in the cradle easily.

How long did it take for the successful installation?

4 weeks

Internal Shop Floor Drawings.

Have been made by professional engineer who has façade experience.

Approval Process:

Approval came instantly

Production & Delivery USP?

Product made according to site conditions

Installation USP?

Analyzing site and offering site specific access solution is one of the key USP of Adventrix.

Client Inspection & Feedback

the client expression was WOW, The building was already a Landmark in Dubai, it is headquarters of Master Development Dubai Investment Park

Emirates Hills Way Finding Signage

November 2016

Brief given by client?

Client wanted install Wayfinding and directional signage on the streets of Emirates Hills community where the large high net worth individuals live in. it needs to have visibility in the day and night as well.

How the problem affected their goals?

The Bad Existing sign does not guide the visitors who comes inside the community and finds it difficult to find the villas and houses.

How many competitors?

3 competitors, Adventrix won over competition due to its ability to handle project installations

Mode of Procurement: RFP?

Direct from Emaar properties

Describe the best solution provided by Adventrix in detail.

Adventrix analyzed the whole situation and offered the best solution. The feasibility study was carried out and checked the signage message in various locations. The challenge was to obtain permissions from DEWA/ETISALAT for digging and placing foundations. Adventrix went through the approval process and obtained all approvals.

The challenges that arose during the implementation and how Adventrix tackled it.

The different permissions and safety measures to be taken while doing such a complex job was quite challenging.

How long did it take for the successful installation?

2 months

Internal Shop Floor Drawings.

It was not a difficult task.

Approval Process:

Approval with few revisions

Production & Delivery USP?

Making the signage meeting requirements and specifications of the client is one of the main USP of Adventrix.

Installation USP?

Analyzing site and offering site specific access solution is one of the key USP of Adventrix.

Client Inspection & Feedback

the client expression was Very GOOD, The signage was welcomed by the complete community.

Emaar Downtown Signage

September 2016

Brief given by client?

Client wanted to fix EMAAR signage on top of the building at Level 72

How the problem affected their goals?

Yes. Their Brand visibility was not there before the installation

How many competitors?

3 competitors, Adventrix won over competition due to its ability to handle complex roof top installations

Mode of Procurement: RFP?

Yes Direct from Emaar Properties.

Describe the best solution provided by Adventrix in detail.

Adventrix analyzed the whole situation and offered the best solution.

  1. The Building is 72 floors tall and has lift up to Level 66 only. All materials shall be taken manually through staircase from Level 66 to Level 72
  2. Second challenge, building has no Cradle any other means of access to sign location except the rope access.
  3. Adventrix suggested a joint inspection with the client and contractor and have suggested a spider web scaffolding system, where in the scaffolding is built from Level 72 to the sign location approximately 40 meters from inside the building and connected to the outside scaffolding by piercing through the claddings.
  4. The contractor has agreed to building the scaffolding
The challenges that arose during the implementation and how Adventrix tackled it.

The different permissions and safety measures to be taken while doing such a complex job was quite challenging.

How long did it take for the successful installation?

4 weeks

Internal Shop Floor Drawings.

Approved easily

Approval Process:

Approval came with some revisions in Structural Steel Design

Production & Delivery USP?

Making the Signage and relevant structures to the guidelines and agreeable to the client is one of the main USP of Adventrix.

Installation USP?

Analyzing site and offering site specific access solution is one of the key USP of Adventrix.

Client Inspection & Feedback

The client expression was EXCELLENT, The building was already a Landmark in Dubai Downtown

Last Exit Pylon Signage

August 2016

Brief given by client?

Client requested a 20 M Pylon Sign with a 10 M long illuminated Fork. Probably the longest Fork in the world

How the problem affected their goals?

Their Drive through Restaurants largely depends on this Sign on the main road attracting the crowd from distance

How many competitors?

3 competitors, Adventrix won over competition due to its ability to handle complex installations

Mode of Procurement: RFP?

Yes direct from Engineers Office

Describe the best solution provided by Adventrix in detail.

Adventrix analyzed the whole situation and offered the best solution. Adventrix Designed the Fork and Signage keeping in mind the durability and functionality of signage. The signage came out well and received widely by large crowd.

The challenges that arose during the implementation and how Adventrix tackled it.

The transportation of the Sign Components was bit challenging

How long did it take for the successful installation?

2 months

Internal Shop Floor Drawings.

It was not a difficult task.

Approval Process:

Approval came instantly

Production & Delivery USP?

Making the Signage meeting to the requirements and specifications is one of the main USP of Adventrix.

Installation USP?

Analyzing site and offering site specific access solution is one of the key USP of Adventrix.

Client Inspection & Feedback

The client expression was Fantastic, The signage was visible from a distance of 1 km which is really good to inform large crowd informing about the Last Exit location

Hatta Signage

May 2016

Brief given by client?

Client shown a mountain on which HATTA signage needs to be installed. The signage needs to be visible from the Hatta Roundabout which is 3.5 KM from the signage. The sign needs to be bigger than the Hollywood signage.

How the problem affected their goals?

The client would develop a mountain exotic resort which needs to be largely promoted by using this signage. The signage can bring recognition to the AL Hajar Mountains

How many competitors?

3 competitors Adventrix won over competition due to its ability to handle complex installations

Mode of Procurement: RFP?

Direct from Engineers office

Describe the best solution provided by Adventrix in detail.

Adventrix analyzed the whole situation and offered the best solution. Adventrix did a feasibility study regarding the sign size and has suggested the suitable size for the placement. The signage was designed based on all natural conditions and has been manufactured and installed as per the requirements

The challenges that arose during the implementation and how Adventrix tackled it.

The different permissions and safety measures to be taken while doing such a complex job was quite challenging. The transportation of materials to the mountain was bit of a challenge as the mountain was too steep and there was no proper roads to the sign location

How long did it take for the successful installation?

2 months

Internal Shop Floor Drawings.

There were revisions before we got it approved

Approval Process:

Approval from design office was quick

Production & Delivery USP?

Making the product to the guidelines and agreeable to the client is one of the main USP of Adventrix.

Installation USP?

Analyzing site and offering site specific access solution is one of the key USP of Adventrix.

Client Inspection & Feedback

The client expression was AMAZING, The Signage will be another Landmark in Dubai and will beat Hollywood signage in World Records. This location will become the best background for selfies

Danube Home Signage

April 2018

Brief given by client?

Client has briefed that he needs to have Longest sign in UAE which is measuring DANUBE HOME in English 55 meters and DANUBE HOME in Arabic 39 meters. The 4 M Tall 3D letters needs to be fixed on to the third floor of the Shopping Mall on the Roof.  No mechanical fixings allowed on the roof.

How the problem affected their goals?

Yes The visibility of the store from the long distance and from Al Ain Abu Dhabi Highway which is about 1 KM is away is key.

How many competitors?

3 competitors, Adventrix won over competition due to its ability to handle complex roof top installations

Mode of Procurement: RFP?

Direct from Danube Home brand owner

Describe the best solution provided by Adventrix in detail.

Adventrix analyzed the whole situation and offered the best solution. The Building is 3 floors tall and has a roof. It was quite challenging to load all the Sign materials, concrete blocks and Steel Structure. Adventrix used crane for lifting and loading all the materials on the roof.

The challenges that arose during the implementation and how Adventrix tackled it.

The biggest challenge was lifting a concrete with crane.

How long did it take for the successful installation?

30 days

Internal Shop Floor Drawings.

It was not a difficult task.

Approval Process:

Approval came instantly

Production & Delivery USP?

Making the product to the guidelines and agreeable to the client is one of the main USP of Adventrix.

Installation USP?

Analyzing site and offering site specific access solution is one of the key USP of Adventrix.

Client Inspection & Feedback

The client expression was Excellent, The building was already a Landmark in Abu Dhabi, on top of that the Signage has given face lift.